CINCINNATI, Ohio — Crews have started removing the facade of the former Garfield Suites tower in downtown Cincinnati as part of a selective demolition of the building, WKRC Local 12 reported.
The downtown development organization 3CDC bought the property in April for $3.75 million, according to the Cincinnati Business Courier’s reporting of the project, carried by WKRC.
Selective demolition is the surgical version of taking a building down: instead of dropping the whole structure at once, crews strip it piece by piece — here, beginning with the facade — which is the approach used for towers standing in the middle of a dense downtown street grid.
The Garfield Suites tower has been one of downtown’s unresolved buildings, a former hotel property in a central business district where 3CDC has spent two decades assembling and redeveloping key sites, from Fountain Square to Over-the-Rhine.
A $3.75 million purchase followed by a facade-first demolition tells downtown watchers the site is moving from holding pattern to active project: owners do not pay to strip a tower’s skin unless the building’s next chapter — reuse or replacement — is being prepared.
For people who work and drive downtown, the near-term meaning is construction itself: scaffolding, crews and a tower slowly changing its face in the middle of the city.
The start of work also closes a long chapter of uncertainty for the property. A vacant former hotel tower in the heart of a downtown is not a neutral thing — it is frontage that generates nothing, faces the street with dark windows, and waits. Whatever 3CDC ultimately builds or restores on the site, the facade coming off is the first visible evidence that the waiting is over.
What happens next: the facade removal continues as the selective demolition proceeds, and 3CDC’s plans for the former Garfield Suites site take shape in public as the work advances.
Photo: Ynsalh, CC BY-SA

